HOT WATER SOLID FUEL BOILER

36

37

Delivery, obligatory and additional equipment:

Delivery

— Boiler body with boiler doors

— Exterior casing with insulation,

thermometer, cleaning accessories

(scraper, brush, accessory holder)

— Cyclone CC for removing dust particles

— Flue gas fan

— Boiler controller

Connection to heating system with buffer tank CAS (recommendation)

— Boiler pump

— 3-way motorized mixing valve with regulator (as ESBE CRA)

— CAS buffer tank (min. 30 lit/kW)

— Open expansion vessel

Possible accessories

— Cyclone with fan and controller

Connection to the heating system

— Bypass pump and pump thermostat (0-65°C)

— Manual 4-way mixing valve

— Open expansion vessel