TWO COMBUSTION CHAMBER BOILERS / AND WITH DHW TANK

44

45

Delivery and obligatory additional equipment:

TEHNIKA GRIJANJA

Delivery

— Boiler body with boiler doors

— Exterior casing with insulation

and pump thermostat, draft

regulator, set (screws,

dowels, plug, rosettes),

cleaning accessories

(scraper, poker, brush,

accessory holder)

Solid fuel firing, without CAS

buffer tank

— Manual 4-way mixing valve

Closed heating system

— Thermal valve, thermal

exchanger (only 49kW), safety

airvent group (2.5 bar) and

expansion vessel

Open heating system

— Open expansion vessel

Solid fuel firing, with CAS buffer tank

— Buffer tank CAS (30lit/kW), 3-way

thermostatic valve LTC, VTC ... (60;)

Closed heating system

— Thermal valve, thermal exchanger

(only 49 kW), safety airvent group (2.5

bar) and expansion vessel

Open heating system

— Open expansion vessel

Wood pellet firing

— Cm Pelet-set Touch (25 / 35kW)

with fan flap

— Manual 4-way mixing valve

or buffer tank CAS (30lit/kW)

and LTC, VTC ... (60°C)

Closed heating system

— Safety airvent and

expansion vessel

Open heating system

— Open expansion vessel

Fuel oil firing only

— Boiler controller EKO-CK/CKB

— Fuel oil burner; manual

4-way mixing valve or buffer tank

CAS and LTC, VTC ... (60°C)

Closed heating system

— Safety airvent group and

expansion vessel

Open heating system

— Open expansion vessel