Give indications for a correct design and installation of water treatment systems

In compliance with mD 26 of 2015 minimum requirements decree - Treatment obligations Annex 1, chapter 2.3, point 5.

Heating Powe

Water Hardness up to 15 °f

Water Hardness above 15 °f

≤ 100 kW

> 100 kW

Filtration

Chemical conditioning

Softening

Mandatory treatments

Filtration + Chemical conditioning

Treatments

Intervention

Filtration

+ chemical conditioning

Filtration + Softening

+ Chemical conditioning

mAG-neX Series

FILmAX Series

AquATemIT

®

Series

Facot products

WL-FILroT / WL-FILmAT rAH / WL-BoX

PoLIFoS Series

AquATemIT

®

Series

3

Give indication for the washing and commissioning of newly built or modified systems.*.

How?

By performing a pickling, that is, the removal of oxides from metals and processing residues.

remember that new does not mean clean and suitable for operation!

Washing

Pickling

Protection

without anti-freeze agent

Protection

with anti-freeze agent

Preserved circulator

Surface oxides and dissolved impurities

System protected from corrosion and algae

System protected from freezing and corrosion

4

Give guidance for the renovation of existing systems, for example, with scale,

corrosion or biological growth problems

How?

on existing systems, it is even more advisable to perform a renovation, that is, remove any inconsistencies

and slush that prevent proper heat exchange.

Intervention

Sanitary water

Product/equipment

DISIFLuX PumP

FerroneX

FILmAX Series

ALIGeL Series ≥ 30%

Product/equipment

Washing

Renewal

Protection

without anti-freeze agent

Protection

with anti-freeze agent

NON MODIFIED system

Protection with anti-freezing

on MODIFIED SYSTEM*

Preserved circulator

removal of sludge and magnetite

System protected from corrosion and algae

System protected from freezing and corrosion

System protected from freezing and corrosion

DISIFLuX PumP

AnTIneX series

FILmAX Series

ATIGeL, ALIGeL Series ≥ 30 %

ALIGeL Series ≥ 30 %

*

System change: operation that includes at least one intervention (excluding replacement with component of the

same type) on the generator and/or distribution and/or its related components (e.g. exchangers, pumps, two-way

valves, etc.) par. 3.1.23.

37

Outcome

Outcome

Technical water plant