D
N
2
0
82
modules can be used in nearly any combination
including 1" union nut for assembly on a PAW distribution manifold.
With PAW mounting equipment, the HeatBloC® can be installed on wall
brackets.
easy handling, visible closing position
made of durable elastic EPP, complete insulation of valves and
fittings,
ventilation opening to cool the pump.
The insulation for the distribution manifold is integrated in the heating
circuit insulation.
can be opened, 200 mm wc, spring-loaded, and thus also suited for
horizontal and overhead installation
The HeatBloC®s can be delivered with
flow on the left against additional
charge.
also for heating circuits with mixing valve
can be pulled off, with immersion sleeve, integrated in the ball valve
fitted with 2 m cable, already installed, integrated in the insulation,
pressure tested, serial number, perfectly designed system, pump
characteristics, EuP/ErP READY
so that it can be replaced without draining
At the end of the chapter, you will find the complete mounting
equipment for the modular system DN 20.
01/2024 • Printed in Germany
PAW GmbH & Co. KG • info@paw.eu • www.paw.eu