DIRECT INSTALLATION ON GRASS

Ideal for: Gardens, gazebos, walkways.

1- Remove the soil below the area where the sheet will be laid to a thickness of about 5-6 cm

2- apply gravel to a thickness of about 3-4 cm and compact the foundation

3- Rest the sheets - with at least 1 cm of gap - on the gravel bed and use a rubber hammer to eliminate any unevenness.

A

B

C

A

B

A. Tile

B. Fine gravel or sandy laying bed

C. Ground

A

B

C

A

B

C

Laying with closed joints

Laying with open joints

INSTALLATION ON GRAVEL AND SAND

A

A

B

B

Ideal for: gardens, patios, courtyards, pedestrian walkways, beach resorts, perimeter areas in pools.

A

C

C

1- Compact the level of the resting layer (sand or gravel)

2- Lay the sheet on the bed of gravel or sand, maintaining a minimum gap of 1 cm or wider

3- Use a rubbeAr hammer to eliminate any unevenness

C

4- Fill in the joints between the sheets with gravel or sand to provide greater stability to the surface

A

B

C

C

26

RAK CERAMICS | 2021

27

B.

C.

D.

E.

F.

G.

Fine gravel or sandy laying bed

Concrete screed (may include electro welded mesh)

Reinforcement layer

Concrete screed

Loose stone foundation (gravel)

Soil

G

B

B

A

A.Tile

F

E

A

B

C

A

B

C

A

A

B

C

A

A

B

B

C

C

B

LAYING DIRECTLY ON GRASS

H

C

D

C

A

A